IA Consulting EngineeringS.r.l. — Rome

Projects  /  01  /  Roads · motorways · bridges and structures

Roads

Alignment, bridges and viaducts, tunnels, drainage and digital modelling of existing structures.

OP.07SS 16 “Adriatica” · Alfonsine bypass  — image 1

Realignment from km 120+238 to km 147+420

SS 16 “Adriatica” · Alfonsine bypass

BIM design of the realignment of national road SS 16 “Adriatica” between km 120+238 and km 147+420, including the Alfonsine bypass.

Commissioned byCODING S.r.l.
Year2023
ServicesBIM design
Lengthkm 120+238 to 147+420
SS 16 “Adriatica” · Alfonsine bypass  — image 2SS 16 “Adriatica” · Alfonsine bypass  — image 3
EC.10Aerial view of the bypass setting: the tunnel portal, the bridge over the Meschio and the roundabout connecting to the SS 51 di Alemagna

Treviso — SS 51 di Alemagna, eastern bypass

Vittorio Veneto bypass

SS 51 di Alemagna, Vittorio Veneto bypass — eastern ring road: La Sega–Ospedale link, first phase La Sega–Rindola.

ClientIngegneri Associati Infrastrutture
Contracting authorityANAS
Years2012–2015
ServicesRoad design, bridges and structures
ReferenceVE13/09
StatusCompleted
EC.09Marche-Umbria road corridor, Maxi Lotto 2 — extract from a construction drawing: elevation of an overpass, 23.00 m span on abutments founded on Ø 1200 piles, 25.00 m long

Fabriano–Matelica Nord

Marche-Umbria road corridor — Maxi Lotto 2

Detailed design support for the completion works on the Perugia–Ancona corridor, Fabriano–Matelica Nord lot, minor structures, within the Quadrilatero inland access programme.

ClientPROGIN S.p.A.
Contracting authorityQuadrilatero Marche S.p.A.
Year2015
ServicesDetailed design support
StatusCompleted
Marche-Umbria road corridor, Maxi Lotto 2 — extract from a construction drawing: longitudinal elevation of a viaduct, three 50.00 m spans on piers founded on Ø 1500 pilesMarche-Umbria road corridor, Maxi Lotto 2 — extract from a construction drawing: cross section of the reinforcement of a reinforced concrete box underpass
EC.16Southern Tyrrhenian Corridor — photomontage of a motorway interchange on an orthophoto, with crossing viaduct and slip roads onto the existing network

Lazio — Rome–Latina–Formia and Cisterna–Valmontone

Southern Tyrrhenian Corridor

A transport infrastructure system improving north-south connections along the Tyrrhenian coast, completing and relieving the central motorway corridor of the Autostrada del Sole. The system comprises three tolled motorway routes — Rome “A12”–Rome “Tor de’ Cenci” over 16.0 km, Rome “Tor de’ Cenci”–Latina “Borgo Piave” over 52.3 km and Cisterna–Valmontone over 31.5 km — together with the secondary feeder network, including the Latina and Lariano bypasses and the Aprilia, Artena and Velletri–Cori routes.

ClientRegione Lazio / ARCEA Lazio S.p.A.
Years2005–2009
ServicesStructural design
bridges, structures and works along the route
Value€1,400M
StatusCompleted
Southern Tyrrhenian Corridor — aerial view of a plain section of the route, running alongside existing development
OP.08BIM modelling of viaducts · Scan to BIM  — image 1

ANAS framework agreement — Abruzzo and Molise, Apulia, Basilicata

BIM modelling of viaducts · Scan to BIM

Development of BIM models of bridges and viaducts for the digital modelling of ANAS structures, under the Regional Structures Framework Agreement. The viaduct modelled consists of seven prestressed concrete spans, each formed by three double-T beams connected by two end diaphragms and three intermediate ones, with a span of about 29.00 m and an overall deck width of 9.50 m.

Commissioned bySINTAGMA S.r.l.
Year2023
Project forANAS
ServicesScan to BIM · modellazione
BIM modelling of viaducts · Scan to BIM  — image 2BIM modelling of viaducts · Scan to BIM  — image 3